medical incinerator producer


1. The double chamber incinerator shall ideally be made. Air supply in the primary and secondary chamber shall be controlled in between 30% -80% as well as 170% -120% of stoichiometric amount specifically. Circulation meter/suitable circulation measurement tool shall be supplied on the key and second air ducting. The combustion air shall be provided via a separate forced draft fan bookkeeping for the air supplied with burners. Provision shall be made in the main chamber to gauge the water column pressure.
2. Ability: as much as 4000kg burn not less than 500 kg/ hr.
3. clinical incinerator manufacturer The refractory lining of the chamber shall be strong sufficient to maintain minimal temperature of 1000dc in the primary chamber and also 1200 dc in the secondary chamber. The refractory& & insulation blocks shall have minimum 115mm density each & & conform to IS:8 -1983 & & IS:2042 -1972 respectively.
4. The incinerator covering will be made from SS/MS plate of appropriate thickness (minimum 5mm) as well as painted on the surface with warmth resistant aluminium paint appropriate to hold up against temp.of 250 dc with correct surface preparation. Refractory lining of the warm duct will be done with refractory castable (minimal 45mm thick)& & insulation castable( minimal 80mm thick). Ceramic woollen will be used at warm duct flanges & & development joints.
5. There will be a separate burner each for the key & & second chamber. The warm input capacity of each burner shall suffice to increase the temp.in the main & & secondary chambers as 800+/- 50dc and 1050+/ -50 dc specifically within optimum of 60 mins prior to lose billing. The heaters shall have automatic changing off/on control to stay clear of the fluctuations of temperature levels beyond the called for temp.range.
6. Incinerator shall have visuals or computer system recording tool which shall instantly and also continuously screen as well as document dates, time of day, set consecutive number, Carbon monoxide, Co2, O2 in gaseous exhaust will also be gauged daily.
7. Architectural layout of the chimney/stack shall be based on IS:6533 -1989. The chimney/stack shall be lined from inside with minimum of 3mm thick all-natural tough rubber ideal for the task problems and also shall additionally conform to IS:4682 part I-1968 to prevent deterioration to oxygen and also acids in the flue gas.

8. The incinerator must have an emergency situation air vent. The emergency vent will continue to be closed ie. it shall not emit flue gaseous during normal procedure of the incinerator.

9. Steel gas storage tank from black steel (capability not less than 2500 litres) and also will be set up at the incinerator Space. The container will be supplied with all needed installations consisting of fill, vent, drain as well as overflow line, level sign and also access for examination and also maintenance. Degree switches over will be provided for the complying with solutions.

(a) Reduced level alarm system.
( b) High degree alarm system.
( c) Reduced degree beginning of transfer pump.
( d) High degree stop of transfer pump

10. An all set built produced space shall be supplied for real estate the incinerator. The area will certainly be created in such a way that vacuum is offered on all sides and warmth radiation maintained minimum as well as offering the operators a simple convenient environment as well as ventilation. The materials will be sufficient structural thickness of moderate steel angles neatly covered with metal primer and epoxy repaint to hold up against sea corrosion.
– – effectiveness for the therapy of placenta? and ended or spoiled medicines, cytotoxic and also cytostatic medications recommended: narcotics eg.
– – Does it allow to deal with drug or waste consisting of glass (whatever color: clear or colored white) without triggering surges?
– – The capacity of the liquid waste treatment (blood, urine discolored, other body fluids contaminated, no matter what quantity product packaging?
– – The efficiency of process chemicals (after neutralization and also cleansing: solids and also liquids).
– – Exists microbiological testing especially: the processing efficiency bascillus