* Burner with gas, mono-bloc spreading helping kind with straight fire, lights as well as safety and safety of digital ignition, long-term ventilation, electro-magnetic sluice gate of plan and dividing shutoff.
* An additional shot of air to ensure excellent oxygen material.
19. A control box guaranteeing the overall cycle of burning.
20. Fan:
* Electro-ventilator dispersing the second air, the regulation of the air flow being completed by shutoffs and sticking to the control of the automated cycle.
21. Controls as well as plans:
Control box watertight to dust, containing:
* A switch breaker for each and every engine (ventilators and additionally heating units).
* A timer with adjustable temporization for the law of each heater.
* A regulatory authority with watch for the temperature level of burning.
* A regulative authority with watch for the temperature level of postcombustion.
* Electric box.
21. The de- ashing has to be performed in the bottom of the burning chamber or the deashing requirement to be Automatic or manual collection de ashing.
22. Improve Filtering system: Scruber to be mentionned as optional
23. Exhaust Standards Conformity: BS 3316 or équivalent requirement
23. Capability to deal with Plastic: Very little less than 40% by weight
24. CE Production Conformity: BS EN 746-2-1997
22. The provider needs to provide collections of additional parts of very first severity as well as consumable of the incinerator.
23. The established heater should birth a one year guarantee.
24. The representative will perforn an onsite installment of the heater.
25. The technical training of motorists will certainly need to be provided and likewise provided by an expert from
the production facility; it will include also preventative and medical upkeep, as well as making use of equipment, etc
NB.: Civil jobs as well as any kind of kind of various other related services for the configuration as well as likewise training of drivers need to be included in the burner’s price.
Spec for the shelter of the burner: Residence of the burner extensive in deal (your residence have to have centers for hand cleansing and likewise firefighting).
This product as well as also tools have to include in the shed of the heater: foundation in debris rock, privacy roofing versus humudity; altitude with block of 20 cm (bloc concrete), continuing lintel (linteau) in boosted concrete; steel framework (charpente en steel); roofing covering in sheet B.C.A. 28 BG (Toiture en t?le), steel rain gutter, hygienic setup (laundry container, soakway pit of 20 m of deepness); ash pit of 30 m3, electrical configuration; concrete piece for handling the heater; chanel for discharge of rain water or drainage, cord mesh for oygenation up the lintel; smooth rougtcasting of walls (inside as well as outdoors); plinth with cement; 2 steel doors; email paints inside as well as likewise latex paints outside your residence on wall surfaces and also on doors; roofing restriction (planche de rive); steps for this specification will absolutely depend upon the measurement of the burner which will identify the dimension of the shed of the incinerator., etc